Drainage specialists · Nanaimo & the mid-Island250-857-4567
Project planning

Drainage, retaining walls and patios: which work comes first?

Plan a connected landscape project so the finished work supports the groundwork.

Begin with the whole property

A wet yard, a wall and a new patio can be connected problems. Start by discussing existing levels, water routes and how you want to use the space. Choosing the final surface before understanding these relationships can leave important decisions unresolved.

Resolve the below-ground questions

Where investigation is needed, establish what is known about existing drainage and the proposed outlet. Coordinate the planned drain routes, excavation and wall design before installing surfaces that would make access harder.

Agree on a site-specific sequence

The sequence may include investigation, design and approvals, excavation, drainage and wall construction, then paving or concrete and landscape restoration. The exact order depends on the project. Ask which stages need to be completed or checked before the next begins.

Phase work without losing the plan

If budget requires stages, ask which work should be coordinated now and what can reasonably wait. Record final levels, connections and restoration limits so later work fits the earlier stage. Share both the immediate problem and the longer-term goal when you contact Clayton.

Talk through your property with Clayton

Send photos, approximate dimensions and your project location. We can discuss the next assessment step and the scope that fits your property.

Call ClaytonRequest a quote